Locals divided over whether Black Cat roundabout upgrade is 'money well spent'
The A428 upgrade between the Black Cat and Caxton Gibbet is due to open in 2027, but opinions are sharply divided
Copyright © 2026 cambridge.yabsta.co.uk
All Right Reserved
powered by 
The A428 upgrade between the Black Cat and Caxton Gibbet is due to open in 2027, but opinions are sharply divided
The road was closed in both directions whilst barrier repairs and investigation works were carried out
The Cambridgeshire shopping centre announced the news at the end of June
The officer, who worked for Cambridgeshire Police, faced a misconduct hearing
A man in his 20s suffered serious injuries
The road is still closed in both directions whilst barrier repairs and investigation works are carried out
All emergency services attended the scene
Traffic is blocked from access in both directions in the wake of the crash which saw a vehicle career from one carriageway and across the other
The Met Office says a return to heatwave conditions is looking "increasingly likely" next week with 40C forecast
He was found lying on the floor of his cell semi-naked and covered in urine and faeces